A new wing for a Northeast Philly school A gym, a cafeteria and workshops on Roosevelt Boulevard

MaST Community Charter School plans a three-story building of about 83,000 square feet beside its school in Parkwood, the old Crown Cork & Seal offices. The city's design panel gets its first look on December 1.

The new building in a few seconds: its glass corner, the picnic pavilion, and the front at dusk. Renderings: EwingCole, animated · Civic Design Review submission, November 2026

Many Septembers, a tent went up on the lawn at 1 Crown Way, just off Roosevelt Boulevard. The city's permits list it for Crown Cork & Seal, the packaging company whose headquarters stood beside it: 60 feet by 100, an assembly tent. Since 2022 the tent permits name a school instead.

Since 2019 the three-story office building, built in 1996, has been home to MaST Community Charter School. Now the school plans its biggest addition yet: a new three-story building with a full gymnasium, a cafeteria, workshops and classrooms, joined to the old one by an enclosed walkway. The architect is EwingCole. Its packet for the city's Civic Design Review goes before the panel on December 1.

Street map: the school's campus on Roosevelt Blvd, dashed, at Crown Way
The campus (dashed) on the Boulevard at Crown Way, with Byberry Creek behind it. Map: Before the Brick on Mapbox · © Mapbox © OpenStreetMap

From office park to campus

The plan came before the neighbors in 2018, when the Parkwood civic association backed the plan for a third MaST school on the Boulevard. A year later, The Inquirer's architecture critic looked at how the corporate offices became classrooms.

The campus has been growing ever since. The city's permits show a gym in its own building in 2021, two more floors turned into classrooms in 2022, and in 2024 an athletic field with bleachers and a scoreboard. The new building is the next step, and the largest.

An open-air picnic pavilion on the lawn beside the new building
An open-air picnic pavilion beside the new building. Rendering: EwingCole · Civic Design Review submission, November 2026

By the numbers

The packet's own pages put the plan in a few figures.

83,125sq ft, the new building
327,926sq ft of school today
3 storiesabout 46 ft tall
613parking spaces on the campus
176 kWof solar panels
134new trees, for 130 taken down

From the packet's zoning, sustainability and planting pages. Of the trees in the work area, 36 stay, among them a heritage tree the plan keeps.

The new three-story building from the northwest: a glass corner, blue panels, a lawn in front
The new building from the northwest, its glass corner toward the lawn. Rendering: EwingCole · Civic Design Review submission, November 2026

Inside and out

The plans show the big rooms: a gymnasium, a cafeteria, a fitness room, a multi-purpose room, and two workshops called Fabrication and Creation, with floors of classrooms besides. The gym built in 2021 stays, as the campus's second, which the plans call the auxiliary gym.

Outside, the plan adds basketball courts, a tiered courtyard under a shade canopy, the picnic pavilion, more parking to the east and a longer drop-off lane in front. Underground, a basin would hold back storm water.

The new building from the southwest, the drop-off loop in front
From the southwest, along the drop-off loop. Rendering: EwingCole · Civic Design Review submission, November 2026
The landscape plan: the new building, courts, courtyard, pavilion and parking beside the existing school
The landscape plan: the new building beside the old, the courts, the courtyard and the new trees. Plan: EwingCole · Civic Design Review submission, November 2026

At the Zoning Board

The campus spans more than 40 acres under three kinds of zoning: single homes, industry, and a special office park district. The plan needs zoning variances, so it goes to the Zoning Board: the packet lists a hearing for January 27, 2027, and a community meeting with the neighbors for November 18.

What happens next

  1. The three-story building goes up at 1 Crown Way, home to Crown Cork & Seal's offices for years after.
  2. MaST Community Charter School opens in the old offices.
  3. A gym in its own building.
  4. An athletic field with bleachers and a scoreboard.
  5. The design packet for the new building.
  6. A community meeting with the neighbors.
  7. Civic Design Review, first review. The meeting is public.
  8. The Zoning Board's hearing.
  9. We'll be back with what the panel had to say.

Send your plansBook a visitAsk a question

Start with your drawings.We come and measure it.What would you like to know?

We answer within one working day with the price and the date.We answer within one working day with the price and a day for the visit. Nothing to pay now.We answer within one working day.

Which package?
Which one?

    Your drawings stay private. We use them only to price and build your model.We use what you send only to price and book the visit.We use what you send only to answer you.